I have been bringing water pipes up to Hui Ba Rai for the last two days. So far we put in 1 kilometer of pipes. The terrain is rather difficult and steep. There are several hills on the way to the village we have to bypass. Unfortunately there is no direct way. We work with gravity and there is no way that the water would flow up hill. I wish it would though.
This is our first project we try with LDPE pipes instead of PVC. The pipe comes in a role of 100 meters. I must say that so far I like this kind of pipe a lot more due to flexibility and only a connection every hundred meters. There is also no messy glue used.
On Monday I will go up again with more pipes. The project is more extensive than I evaluated before and I have to take a little break from Thai studies to finish it.